Client: City of Wolfenbüttel Central Procurement Office
Location: Braunschweig
Period: 2018 to 2019
Road construction:
Excavation: 18,300 m³
Subgrade: 19,000 m²
Frost protection fleece 0/32 FSS: 5,250 m³
Gravel base course 0/32 STS: 17,800 m²
Asphalt base course AC 22 TS D=10 cm: 3,200 m²
Asphalt binder AC 16 B5: 3,200 m²
Colored asphalt surface: 3,200 m²
Concrete composite pavement: 1.000 m²
Natural yellow-beige paving: 10,500 m²
Natural reddish paving: 2,300 m²
Natural 3‑row yellow-beige gutter: 1,100 m
Concrete 16/16/14 gutter: 320 m
Concrete H kerbstones: 320 m
Natural yellow-beige kerbstones: 800 m
Canal construction:
Open dewatering: 649.20 m
Excavation pit shoring up to T=3.00 m: 3,442.59 m
Excavated soil: 2,763.285 m³
Soil removal Z2: 4,883.011 tons
Pipe support liquid soil, d=20 cm: 1,820.978 m²
Installing liquid soil: 1,160.407 m³
Soil placement main backfill: 384.211 m³
Pipelines
- PE-HD 160x9.5: 148.83 m
- PE-HD 225x13.4: 690.13 m
- DN 150 PP: 250.13 m
- DN 200 PP: 18.25 m
- DN 300 PP: 142.2 m
- DN 400 PP: 484.14 m
- DN 600 PP: 223.05 m
- DN 700 PP: 32.70 m
- DN 800 PP: 38.80 m