OPTIMUM SUPPORT FOR INFRASTRUCTURE PROJECTS.
In structural and technical engineering, we specialize in open excavations for infrastructure construction projects. Tunnel and ramp structures are our core competence. Following planning and design, we implement measures such as frame structures for overpasses, excavation pit construction and enclosures, excavations or the insertion of frame structures in prefabrication areas. Our engineers are highly qualified and experienced in complex large-scale projects with long construction times.
PERFECTION AT EVERY INTERFACE.
We are experts in the precise integration of our projects in cooperation with other construction sectors and companies. We have decades of experience, particularly in major rail and aviation projects, which we apply at all necessary points to achieve optimum construction results. We act as an equal partner in every area and at every level. As part of a strong construction company, we can meet logistical and scheduling requirements flexibly and reliably, even under challenging conditions.
OUR MOTIVATION FOR THE BEST OVERALL RESULT.
From design and construction to implementation, we reliably provide our clients with the best possible solutions from a single source. Our employees work towards this every day with motivation, commitment and expertise. We are constantly improving our qualifications because we are inspired by new technologies.
This also includes compliance with environmental requirements and emission protection in accordance with the relevant laws and the conditions of the respective planning approval.
CERTIFICATES
- SCC**:2011
- PQ certificate from Deutsche Bahn AG in the category of structural engineering, including for the following services (product groups): Structural engineering-construction under railroad operation
- Certificate of prequalification according to §6a VOB/A, §6a EU VOB/A, §6a VS VOB/A
- DIN ISO 9001
- DIN ISO 14001
- AMS Construction (01/2015)
ONGOING PROJECTS
EXTENSION OF THE U5
To improve the attractiveness of public transport, the City of Munich is extending the U5 subway line from the existing terminus at Laimer Platz to Pasing station.
A26 PORT RAILWAY TUNNEL
For the new construction of the A26, construction phase 4 will realize the connection of the A26 to the A7 and the expansion of the sections bordering the new connection to the south and north.
REFERENCES
STUTTGART 21
Completion 2017
ABS HANAU NANTENBACH
Completion 2016
RUDOLFSTRASSE APW XII 2. BA
Completion 2014
Contact us
AUGUST REINERS Bauunternehmung GmbH
E ingenieurbau@hegemann-reiners.de
EMPTY
Hollener Straße 53 | 26670 Uplengen
T +49 4956 928755–0
STUTTGART
Erich-Herion-Straße 3 | 70736 Fellbach
T +49 89 32361–800