You are currently viewing HEINRICH THE LION BARRACKS

HEINRICH THE LION BARRACKS

Cli­ent: Woh­nen Hein­rich der Löwe GmbH
Loca­tion: Braun­schweig
Period: 2017 to 2018

Road con­s­truc­tion:

Excava­tion rem­oval: 23,650 m³
Soil instal­la­tion: 500 m³
Soil rem­oval: 19,500 m³
Fill soil instal­la­tion: 800 m³
Sub­grade: 26,200 m³
1st TS B/45 d. AG: 800 m³
1. TS B/32: 7,800 m²
STS 0/32 D=15cm: 23,700 m²
Bit. Base course D=6cm AC16DN: 3,350 m²
AB-warm 8.75kg/m²: 16,300 m³ 

RW chan­nel:

Excava­tion: 8,500 m³
Rem­oval: 7,800 m³
Fil­ling gra­vel: 5,600 m³
Sho­ring: 8,050 m²
Ground­wa­ter open: 1.025 m
Pipe­line
- DN 500 SB: 747 m
- DN 600 SB: 575 m
- DN 700 SB: 230 m
- DN 800 SB: 210 m
- DN 900 SB: 30 m
- DN 300 SB: 700 m
- DN 400 SB: 775 m
- DN 1100 SB: 45 m

SW chan­nel:

Excava­tion: 4,800 m³
Rem­oval: 4,800 m³
Fil­ling gra­vel: 4,000 m³
Sho­ring up to 3.00: 16,700 m²
Sho­ring up to 5.00: 400 m²
Ground­wa­ter open: 1,260 m
Pipe Stz DN 200: 2,550 m