Client: Wohnen Heinrich der Löwe GmbH
Location: Braunschweig
Period: 2017 to 2018
Road construction:
Excavation removal: 23,650 m³
Soil installation: 500 m³
Soil removal: 19,500 m³
Fill soil installation: 800 m³
Subgrade: 26,200 m³
1st TS B/45 d. AG: 800 m³
1. TS B/32: 7,800 m²
STS 0/32 D=15cm: 23,700 m²
Bit. Base course D=6cm AC16DN: 3,350 m²
AB-warm 8.75kg/m²: 16,300 m³
RW channel:
Excavation: 8,500 m³
Removal: 7,800 m³
Filling gravel: 5,600 m³
Shoring: 8,050 m²
Groundwater open: 1.025 m
Pipeline
- DN 500 SB: 747 m
- DN 600 SB: 575 m
- DN 700 SB: 230 m
- DN 800 SB: 210 m
- DN 900 SB: 30 m
- DN 300 SB: 700 m
- DN 400 SB: 775 m
- DN 1100 SB: 45 m
SW channel:
Excavation: 4,800 m³
Removal: 4,800 m³
Filling gravel: 4,000 m³
Shoring up to 3.00: 16,700 m²
Shoring up to 5.00: 400 m²
Groundwater open: 1,260 m
Pipe Stz DN 200: 2,550 m