Location: near Stuttgart
Period: 2020 to 2021
Category: Concrete repair
Other: Deutsche Bahn single and double-track railroad tunnel | Concrete repairs based on the client’s and DB’s repair concept
In the course of the new construction, numerous concrete repair works were carried out, especially in the very complicated area of the open construction method.